Dubai · The Fitworks collection
+971 58 827 4544WhatsApp
DESIGN STUDY / 01

The mineral suite

An original bathroom renovation concept exploring how material, proportion and practical use can work together.

The mineral suite — original design concept
Original design concept · Velune Bathrooms

The brief

Beautiful bathrooms supported by careful waterproofing, drainage and installation. This study explores a setting where daily use and a clear visual language guide the design together.

The design thinking

Velune brings a calm design sensibility to bathroom renovation, with equal attention to the concealed work and the surfaces you see. The result starts with a thoughtful, coordinated specification. The concept brings that approach into a spatial idea, using a restrained material palette and clear relationships between the main elements.

From concept to your property

A visual direction is the beginning of a conversation. Translating it into a project requires measured information, a site review, specialist coordination and an agreed specification.

  • Room size and existing condition
  • Waterproofing and substrate preparation
  • Fixtures, screens and concealed fittings
  • Tile format, setting-out and joinery
Develop a brief like this
THE STUDY IN DETAIL

The challenge behind the idea.

Drainage, waterproofing, fixture supports and maintenance access need coordinated review before tiles conceal them.

Original design concept

Concept: private bathroom suite

Combine a quiet material palette with an easy daily routine, giving concealed work the same attention as the visible surfaces.

Design decisions

  • Set out fixtures, niches and tile joints from measured information.
  • Name concealed-work inspection points in the agreed scope.
  • Review cleaning and maintenance access for every selected fitting.
PROPOSED PROJECT TIMELINE

From the first brief to handover.

A proposed sequence for this design study. External review periods, site conditions and supplier lead times are confirmed for each commissioned project. Some stages may overlap.

  1. Week 1

    Discovery & measured brief

    Combine a quiet material palette with an easy daily routine, giving concealed work the same attention as the visible surfaces.

    Review point · A scope and responsibility record
  2. Weeks 2–3

    Design & coordinated specification

    Set out fixtures, niches and tile joints from measured information.

    Review point · A reviewed drawing and specification package
  3. Weeks 3–5

    Selections & procurement planning

    Name concealed-work inspection points in the agreed scope.

    Review point · A selection register and supply responsibilities
  4. Weeks 6–8

    Proposed delivery sequence

    Review cleaning and maintenance access for every selected fitting.

    Review point · Staged inspections and change records
  5. Week 9

    Review & handover planning

    Review the agreed scope and record outstanding items before completion is accepted.

    Review point · A snagging list, care information and agreed close-out
SPECIFICATION & QUALITY

Details that can be reviewed.

Concept palette

  • Mineral stone appearance
  • Muted green accents
  • Warm indirect lighting

Proposed quality records

  • Approved fixture and drainage layouts
  • Specified concealed-work records
  • Water containment, operation and finish reviews

The concept aims for a coordinated and usable space. Performance requirements, cost and completion milestones are agreed for each commissioned project.

Our project standards
YOUR QUESTIONS, ANSWERED

A clearer next step.

Practical answers for your bathroom renovation brief.

Browse all common questions

THE NEXT CHAPTER

Let’s make room
for your plans.

Tell us what you have in mind. Start a conversation or send a written project brief.

Send a project enquiry