The direct answer
A successful vanity is not simply a cabinet placed below a basin. It is a coordinated assembly of sanitaryware, taps, worktop, storage, plumbing, power, mirror, lighting and wall construction. Brief it by recording what must fit, how the room will be used and which dimensions must be verified before manufacture. The safest approval point is after the selected products are known and the built conditions have been checked, not when the concept image first looks convincing.
Start with routines, not a furniture style
List who uses the bathroom, whether two people prepare at once, which items stay visible and which must be concealed. Separate daily items from refills, cleaning products, towels and electrical grooming tools. Note whether children or guests use the room and whether a seated user needs consideration. This turns vague requests such as “more storage” into a useful inventory. It also reveals whether wide drawers, smaller compartments, a tall unit or a mirror cabinet will provide the most accessible capacity.
Coordinate the wet components as one set
Choose the basin format, tap arrangement and worktop together. An inset, under-mounted, vessel or integrated basin changes the available counter, cabinet depth and cleaning edges. Deck-mounted and wall-mounted taps create different set-out demands. The waste and water connections must coexist with drawers and internal divisions rather than being discovered after fabrication. Product templates and current technical data should be passed to the designer and fabricator; nominal catalogue sizes are not a substitute for the selected model information.
Test storage against services
Draw the real usable volume inside the vanity. A wide front does not guarantee a wide drawer once traps, valves and pipework are allowed for. Decide which service components need inspection or maintenance access, and avoid sealing them behind fixed internal panels without an agreed access method. Removable drawers or access panels can help, but their operation must be checked with the selected hardware. Duravit describes a vanity as a combined basin-and-furniture solution that conceals connections while providing storage; the brief still needs to confirm how those two functions share the same space.
Mirror and lighting belong in the same elevation
Set out the basin centreline, tap, mirror edges, wall lights, sockets and any mirror cabinet on one coordinated elevation. Check what each user sees at the basin and whether an open mirror-cabinet door conflicts with a pendant, wall light or ceiling feature. Lighting should support the face without relying only on a bright downlight above the head. Where power is required near water, the electrical design and installation must be completed and checked by appropriately qualified professionals for the actual location and applicable requirements.
Planning example
Consider a shared bathroom with a 1,500 mm-long wall and a request for two basins. The first sketch shows symmetrical drawers below two vessel basins. Product information then shows that the wastes occupy the centre of each upper drawer, while wall-mounted tap bodies require space inside the wall. The coordinated option uses shallow organiser drawers above deeper offset drawers, confirms access to each valve, and aligns two mirrors with the tap centrelines. The example is a planning method, not a prescribed dimension: the actual room, products and wall build-up determine the result.
Set dimensions from the selected components
Avoid approving a vanity from a single overall width and depth. The schedule should identify finished height, worktop thickness, basin projection, tap reach, mirror position, clearances to adjacent doors or screens and the space needed for handles or finger pulls. Where two basins are proposed, confirm that the arrangement still gives useful counter and drawer space rather than dividing the unit mechanically into equal parts. Check the cabinet against the finished wall and floor build-up, because tiling and waterproofing interfaces can change the opening. Any site dimension that must be confirmed later should be marked as such rather than presented as final.
Decide how the finish will age
Compare finish choices by cleaning routine, water exposure, edge construction and repair strategy. A convincing timber look does not confirm that the panel, lacquer or veneer is suitable for the intended damp environment. Ask for the exact sample and current care information, including restrictions on cleaners and standing water. Define how the worktop meets the wall and basin, where sealant joints are expected and which edges are most likely to be touched. The aim is not to promise a maintenance-free surface, but to select a documented assembly whose care fits the household.
Approval checklist before manufacture
Use the approval as a cross-disciplinary review rather than a finish sign-off.
- Site dimensions and finished floor level have been verified.
- Basin, tap, waste and worktop details match the selected products.
- Water, waste, power and lighting positions are coordinated.
- Drawer paths, door swings and maintenance access are demonstrated.
- Storage has been tested against a named household inventory.
- Finish samples, edges, joints, handles and sealant interfaces are approved.
- Mirror height and lighting have been reviewed in the room elevation.
- Responsibility for final setting-out and protection is recorded.
Limits that should stay visible
A vanity drawing cannot confirm the condition of concealed walls, the exact route of existing services or the suitability of fixings until the relevant areas are inspected. Natural materials and timber-look finishes may vary between samples and completed components. Manufacturer care instructions differ, particularly around standing water, cleaning products and heat. Custom joinery also requires agreed tolerances for walls that may not be perfectly straight. Record these limitations so that site verification and professional coordination are not mistaken for optional extras.
A useful next step
Prepare a one-page vanity schedule containing the selected products, verified opening, storage inventory, finish references, service-access method and a marked-up elevation. Review it with the bathroom designer, fabricator and relevant trades before approving production. If the wider sequence is still unclear, resolve the dependencies before tiles, wall finishes or fixed services remove easy adjustment.
Sources & further reading
Make this useful for your project.
A review of your property and priorities can turn general guidance into a defined brief.
Explore Bathroom vanitiesDiscuss your project


