Direct answer: approve the delivered material, not only the showroom sample

A useful tile acceptance review should confirm product code, finish, nominal size, delivered quantity, shade or dye-lot identifier, calibre where stated, declared variation, edge type, intended location and any matching trims. Representative tiles should then be viewed together in suitable light and arranged against the setting-out plan before installation. The team must agree what variation is intentional, what is inconsistent with the approved sample and which cartons are held as spare stock. A small display sample cannot represent every tile in a varied collection, and a product name alone does not prove that separate deliveries will match.

    Separate product identity from visual character

    Product identity is checked through the supplier documents and carton information: collection, code, colour, finish, size, batch, shade and calibre. Visual character is reviewed by opening representative cartons and comparing colour, reflectivity, veining, texture and print repetition. Marazzi explains that shade refers to coloration and reflectivity while calibre refers to facial dimension, and that production runs can vary. The selected manufacturer’s own terminology controls the review. Record both parts because a delivery can be correctly labelled yet still require deliberate blending and setting-out to achieve the approved appearance.

        Read the declared variation before judging the layout

        Manufacturers may classify visual variation from relatively uniform to intentionally random. A highly varied product should not be rejected merely because adjacent pieces differ, but its layout needs broader sampling and conscious distribution. Conversely, obvious isolated differences in a low-variation product warrant supplier review before installation. Compare tiles in the room’s actual daylight and artificial lighting where possible. Photograph the accepted range with a colour reference only as a record; photographs do not replace physical approval because cameras and screens alter colour. Do not wet, coat or clean samples with unapproved products to force a comparison.

          Coordinate calibre, joints and setting-out

          Facial-dimension differences affect grout-joint consistency and alignment. Confirm the delivered calibre information with the professional installer and selected system supplier before setting-out is frozen. Avoid publishing a universal joint width: the correct detail depends on the product, substrate, tile size, edge, layout, system and applicable standards. Large-format tiles also demand particular attention to substrate preparation and coverage, but detailed installation belongs to qualified professionals following current manufacturer and system guidance. The acceptance review should identify mixed calibres or deliveries early enough for the supplier and design team to decide how to proceed.

              Planning example

              Planning example: a master bathroom uses a marble-look porcelain tile across the floor and shower walls. The delivery contains the correct product code, but the carton review reveals two shade identifiers. The design team lays out representative pieces from both groups in neutral light and finds one group noticeably warmer. Rather than allowing installation to begin, the supplier checks availability and replaces the unmatched group. The accepted cartons are then mixed for a balanced vein distribution and identified spare pieces are set aside. This fictional scenario demonstrates the decision sequence; it is not an installation instruction or a claim about a specific manufacturer.

                  Check quantity, breakage allowance and spare strategy

                  Reconcile the measured net area with the approved setting-out, cuts, pattern direction, niches, returns and expected handling allowance. Do not use one generic waste percentage for every room. Complex layouts, large panels, book-matching or limited replacement availability can change the allowance. Record received quantities and damaged cartons before work. Define which pieces remain unopened or identified as handover spares, where they will be stored and how their product and batch information will be preserved. Separate the quantity needed for the approved layout from contingency stock, and state who may authorise use of the reserve. Check whether trims, mosaics and special pieces have independent batch or lead-time risks. If the order is split, ask the supplier whether the later delivery can match and treat the answer as a risk to manage, not a guarantee. Reconcile remaining stock again before handover so spare cartons are not discarded during final cleaning.

                      Checklist before installation release

                      Complete the review while replacement or clarification remains possible. A release should name the accepted delivery and the approved layout reference rather than simply saying tiles approved.

                      • Match product codes, finish, size and intended locations
                      • Record batch, shade and calibre identifiers from cartons
                      • Open representative cartons across the delivery
                      • Review variation in suitable natural and artificial light
                      • Compare the delivered range with the approved physical sample
                      • Confirm setting-out, pattern direction and visible focal areas
                      • Reconcile quantities, cuts and project-specific allowance
                      • Isolate damaged or questionable cartons
                      • Identify and label handover spare stock

                      Limitations and professional responsibilities

                      This review does not approve substrate condition, waterproofing, falls, adhesives, grout, movement joints, edge profiles or installation workmanship. Those require the appointed designer, system supplier and qualified installer using current documents and site conditions. Manufacturer websites and catalogues can change; retain the technical data linked to the ordered product. Aesthetic acceptance is also project-specific. If the delivered material differs from the approved sample or mixes identifiers unexpectedly, pause and obtain a written supplier response. Do not install disputed tiles on the assumption that cleaning or sealing will make them match.

                          Next step: issue a photographed acceptance record

                          Create a short record with delivery date, supplier, product code, carton identifiers, quantity, representative photographs, physical sample reference, layout notes, spare allocation and the names of reviewers. Mark accepted, quarantined and replacement material clearly without writing on finished tile faces. Link the record to the setting-out drawing and room schedule. Include the observation conditions, the areas sampled and any decision that remains conditional on a replacement delivery. Once questions are closed, issue the installation release to the responsible parties and retain the accepted sample until handover. This preserves the design decision if additional cartons are ordered later and gives the handover team enough information to identify the retained spares.

                              Sources & further reading